Litres of water saved
Lives Touched
Tankers Saved
Maintenance Cost
Our Solutions
Water is going to be scarce in the coming years and there is an immediate need to work on sustainable water management. Urban cities have large vertical complexes with very high water consumption per square foot. The rainwater saved will not be able to meet even 5% of their yearly requirement.
Amazing features that enable saving of water
High Quality Water from BOSON WHITE WATER
Real-time Water Monitoring
As technology becomes complex, it is necessary to monitor data real time.
OPEX Model
Pay only for the water that is used and no capital investment for the equipment.
Turnkey Solution
Each customer is different and water quality is also different, hence we customise solutions.
World Class Expertise
Enjoy World-Class Water Treatment experience and expertise.
Our Clients
Trusted by all our clients
We bring solutions to make life easier for our customers.
Testimonials
Mr. Piyush
Our layout has saved huge quantity of water using this initiative of recycling STP treated water. The water report from the system is consistently giving us great quality of water as per the water reports from laboratories. The system we have is saving 1500 to 2000 lts of water per hr and can save between 10000 to 20000 lts of water per day. Since the water report says potable, we are using this water to recharge our ground water level, there by we avoid the psychological issue of taking the water directly
Mr. Sreejith
We are producing 80-100 KLD of potable quality BOSON White Water from our existing STP treated water, which is being used in cooling towers. With BOSON White Water system in place, we are saving 80-100 KLD of fresh water every day which was used for cooling tower. By using high quality BOSON White Water, our blow down water came down drastically, improved the efficiency of cooling tower and bring down the cost of operation apart from contribution to the water saving.
Mr. Hemanth
We are using BOSON White Water System for our Laundry units since 2022, we were seeing significant improvement in the wash quality, reduced maintenance of equipment, reduction in detergent usage saving costs directs and also helps in operating our ETP easier with high predictability. Overall, we have reduced our fresh water utilization, direct costs and BOSON Whitewater system helps us in achieving our sustainability goals directly attributing to our corporate goals.
Press Coverage
FAQ
Boson WhiteWater system can recover anywhere between 50-75% of potable water from the STP, however the remaining water is sent back to the STP and the system does not send any water to the drain.
The system has a waste water, however the waste water is sent back to the STP inlet at the Bar screen.
No, as long as the STP treated water is meeting the government norms of disposal, our system can take that as input and process the same.
For a 100 KLD recovery we need a space of 18 Feet x 11 Feet X 12 feet (Height)
A. We need to be given space required for the size of the system.
In Bangalore, BOSON White Water comes in 12 KL water tanker, hence the minimum quantity to be ordered is 12,000 Litres.
No, BOSON Whitewater system is a tertiary treatment system designed to improve the quality of the existing STP treated water to meet the BIS 10500:2012 standards. Hence the existing STP needs to be operated to meet the PCB disposal water standards.
No. Since Independent homes or smaller apartments won't have the Sewage Treatment Plant (STP), setting up BOSON Whitewater System is not viable for independent homes or smaller apartments which doesn't have STP's.
Currently we are operational in Bangalore, Hyderabad, Pune, Chennai & Coimbatore.
BOSON White Water System can be installed in any apartment where there are 200+ families living in, which has a functional Sewage Treatment Plant (STP).
In case of an apartment, for 200 - 300 family apartment, BOSON White Water system requires approx. 200 square feet.
For 300+ family apartment, space required will be 300 square feet.
In case of a commercial building/ Industries,
To produce 50 KLD of BOSON White Water from STP treated water, space needed will be 150 - 200 Square feet, and it requires approx. 300 square feed to produce 100 KLD of BOSON White Water.
To produce 50 KLD of BOSON White Water, approx. 15-18 KWh is needed, however this may vary based on the site conditions.
Transwater System Pvt. Ltd,
No.
64, Garden Layout,
H.S.R Layout, 2nd Sector,
Bangalore, Karnataka, India - 560102